imported>Spohr Susanne (Created page with 'de:Beispielgrafik: Residuelle Strömungsgeschwindigkeit =Explanations= Residual value of current velocity (computed from addition of vectors) within the period of data analys…') |
imported>Lang Guenther (→Explanations: sentence added) |
||
Line 2: | Line 2: | ||
=Explanations= | =Explanations= | ||
Residual value of current velocity (computed from addition of vectors) within the period of data analysis. | Residual value of current velocity (computed from addition of vectors) within the period of data analysis. | ||
The residual is computed based on the real duration of flooding (wet period) for each location. | |||
=Examples= | =Examples= |
Revision as of 07:36, 16 September 2014
Explanations
Residual value of current velocity (computed from addition of vectors) within the period of data analysis. The residual is computed based on the real duration of flooding (wet period) for each location.
Examples
residual current velocity |
---|
- maximum current velocity
- mean magnitude of current velocity
- median of current velocity Q_0.50
- quantiles of current velocity Q 0.01, Q 0.05, Q 0.95, Q 0.99
back to Characteristic Numbers of Current Velocity (independent of tides)