Actions

GVIEW2D: Visualization of time series

From BAWiki

Revision as of 09:31, 21 October 2022 by 127.0.0.1 (talk) (The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="nofollow noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Example: Visualize measured data

Visualization of the measured fresh water discharge at gauging station Versen (river Ems) for the year 2000.

Ow2000-en.png

Example: Check boundary data

Comparison of the input and output time series of the program UTRRND. In this case it is a water level comparison at a harbour inlet.

Rndw-en.png

Example: Verify model data

Verification of Trim-2D model data in comparison with measured data. In this case it is a current velocity comparison (absolute value and direction) between measured data at a single position in the water column and at the equivalent model node (depth integrated model data!).

Veri-en.png

Example: Visualize postprocessed analysis data

Visualization of analysis data, computed by the hydrodynamic model TELEMAC-2D and postprocessed with the program Tdklf. You can see the flood and ebb current bed load transport for a selected data node of the north sea model near the mouth of the estuary Elbe.

Analysis-en.png

back to GVIEW2D