Actions

Validation studies Jade-Weser: Difference between revisions

From BAWiki

imported>Koesters Frank
No edit summary
(The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="nofollow noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).)
 
Line 3: Line 3:
==Models of the Jade-Weser-Estuary==
==Models of the Jade-Weser-Estuary==


*Basic model Jade-Weser Estuary, version 1: Topography 2002
*Basic [[model]] Jade-Weser [[Estuary]], version 1: Topography 2002




Line 9: Line 9:
===Basic model Jade-Weser, version 1: Topography 2002===
===Basic model Jade-Weser, version 1: Topography 2002===


For the Jade-Weser-Estuary a model was built based on the mathematical models [[Mathematical Model UNTRIM|UNTRIM]]-[[Mathematical Model SEDIMORPH|SEDIMORPH]] to calculate hydrodynamics, salt and suspended matter transport. The model topography  ('''Figure '' Topography Jade-Weser-Estuary''''') [[File:topo_jadeweser_small.jpg|thumb|'''Figure ''Topography Jade-Weser-Estuary''''': Representation of topography in the numerical grid of the des Jade-Weser basic model.]] represents year 2002. The spatial resolution is high enough to yield realistic results, but still allows for longer integration times (months – years).
For the Jade-Weser-[[Estuary]] a [[model]] was built based on the mathematical models [[Mathematical Model UNTRIM|UNTRIM]]-[[Mathematical Model SEDIMORPH|SEDIMORPH]] to calculate hydrodynamics, salt and suspended matter transport. The [[model]] topography  ('''Figure '' Topography Jade-Weser-[[Estuary]]''''') [[File:topo_jadeweser_small.jpg|thumb|'''Figure ''Topography Jade-Weser-Estuary''''': Representation of topography in the numerical grid of the des Jade-Weser basic model.]] represents year 2002. The spatial resolution is high enough to yield realistic results, but still allows for longer integration times (months – years).


The validation document (available in German only)
The validation document (available in German only)
*Bundesanstalt für Wasserbau, 2012, ''Validierung des Basismodells „Jade-Weser-Ästuar“ für das Verfahren UnTRIM2007-SediMorph Version 1: Topographie 2002'', 108 S.
*Bundesanstalt für Wasserbau, 2012, ''Validierung des Basismodells „Jade-Weser-Ästuar“ für das Verfahren [[UNTRIM2007|UnTRIM2007]]-SediMorph Version 1: Topographie 2002'', 108 S.
can be obtained as PDF-version here:
can be obtained as PDF-version here:
* [http://www.baw.de/downloads/wasserbau/mathematische_verfahren/Validierungsstudien/Modellvalidierung_Weser-GM_UnTRIM2007_v1.3.pdf Validierungsdokument Jade-Weser-Basismodell v1.3], (~ 8.0 MB).
* [http://www.baw.de/downloads/wasserbau/mathematische_verfahren/Validierungsstudien/Modellvalidierung_Weser-GM_UnTRIM2007_v1.3.pdf Validierungsdokument Jade-Weser-Basismodell v1.3], (~ 8.0 MB).

Latest revision as of 09:35, 21 October 2022


Models of the Jade-Weser-Estuary


Basic model Jade-Weser, version 1: Topography 2002

For the Jade-Weser-Estuary a model was built based on the mathematical models UNTRIM-SEDIMORPH to calculate hydrodynamics, salt and suspended matter transport. The model topography (Figure Topography Jade-Weser-Estuary)

Figure Topography Jade-Weser-Estuary: Representation of topography in the numerical grid of the des Jade-Weser basic model.

represents year 2002. The spatial resolution is high enough to yield realistic results, but still allows for longer integration times (months – years).

The validation document (available in German only)

  • Bundesanstalt für Wasserbau, 2012, Validierung des Basismodells „Jade-Weser-Ästuar“ für das Verfahren UnTRIM2007-SediMorph Version 1: Topographie 2002, 108 S.

can be obtained as PDF-version here:





zurück zu: validation studies


Overview