Example figures: tide current duration: Difference between revisions
From BAWiki
imported>Lang Guenther →Explanations: text modified |
imported>Lang Guenther remark on "mean value" computation removed |
||
| Line 6: | Line 6: | ||
* right top: ''maximum value'' of the characteristic number within the period of data analysis. | * right top: ''maximum value'' of the characteristic number within the period of data analysis. | ||
* right bottom: ''minimum value'' of the characteristic number within the period of data analysis. | * right bottom: ''minimum value'' of the characteristic number within the period of data analysis. | ||
=Examples= | =Examples= | ||
Revision as of 14:43, 28 March 2017
Explanations
Period of time between an ebb slack and the subsequent ebb slack.
- left top: value of characteristic number for a single event.
- left bottom: mean value of the characteristic number within the period of data analysis.
- right top: maximum value of the characteristic number within the period of data analysis.
- right bottom: minimum value of the characteristic number within the period of data analysis.
Examples
| tide current duration | maximum tide current duration |
|---|---|
- flood current duration
- ebb current duration
- flood current duration : tide current duration
- ebb current duration : tide current duration
- flood current duration : ebb current duration



